top of page
![Logo Holztragwerke_weiss_web.png](https://static.wixstatic.com/media/6357c8_4ba3c4aca58b40c29e7b9022c46f5b20~mv2.png/v1/fill/w_169,h_78,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Logo%20Holztragwerke_weiss_web.png)
ENGINEERING & INNOVATIONS
Road bridge San Niclà, GR
The first large-scale not covered road bridge made out of timber. Built in 1993, with a total carriageway length of almost 45 m and an arch span of approx. 39m. The arch beam’s variable cross-section possesses a height up to 1.65 m and a width of 1.0 m. Probably the first ever recorded implementation of the GSA technology, as a high performance development of glued steel rods. Timber slabs for the carriageway, cross beams directly attached to the arc, high-quality laminated timber and much more ...
Project details
Building owner
Canton Grisons
Project engineer
Albert Mayer, Sent GR
Link Google Maps
bottom of page