top of page
ENGINEERING & INNOVATIONS
Foot-and-cycle path Agno - Magliaso
Bridge alongside lake and existing cantonal road composed out of 26 prefabricated bridge elements each 12 m long. The individual elements consist of 2 glulam main beams with a cross section 900/200 and a 120 mm thick CLT slab with dimensions of approx. 3.00 x 12.00 m as bottom support for the pavement. Solely the parapets out of steel were not integrated in the prefabrication process and assemblied after the completion of construction of the 26 bridge elements. The total length of the bridge is approx. 312 m.
Building owner
Piano dei Trasporti del Luganese, Cantone Ticino
Architect
Bianchi Angelo Studio d'architettura SA
bottom of page